Release Plan Worksheet: One Page Per Version
Most release mistakes are decisions nobody remembered to make: which runtime versions are still supported, who writes the announcement, what happens if the build is bad. This worksheet puts those decisions on one page. Print it, or copy the tables into an issue or a shared document, and fill it in a few days before you intend to tag.
How to fill it in
- Start one copy per planned version. If plans change from a minor to a major, start a fresh sheet rather than editing the old one, because the compatibility section changes completely.
- Fill sections A and B first. If you cannot fill them, the release is not ready to schedule.
- Leave section E blank until after the release, then use it to record what to change next time.
Section A: scope
| Package name | ______________________ |
|---|---|
| Current version | ______ |
| Planned version | ______ (patch / minor / major / pre-release) |
| Reason for that bump | ______________________________________ |
| User-visible changes (one line each) | 1. ________ 2. ________ 3. ________ |
| Target date | ______ Hard deadline? yes / no |
Section B: compatibility
| Question | Answer |
|---|---|
| Minimum runtime version supported after release | ______ (changed? yes / no) |
| Peer dependency ranges | ______ (widened / narrowed / unchanged) |
| Anything removed or renamed? | ______ Migration note written? yes / no |
| New deprecation warnings added? | ______ Planned removal version: ______ |
| Type declaration changes? | ______ |
Section C: artefacts and publishing
- Artefacts to publish: [ ] npm tarball [ ] wheel(s) [ ] sdist [ ] other: ______
- Built from tag in CI: [ ] yes. Workflow name: ______
- Packed contents checked by: ______ on ______
- Provenance or signature attached: [ ] yes [ ] not yet supported for this registry
- Dist-tag or channel: [ ] latest [ ] next / beta [ ] backport line ______
Section D: communication and rollback
| Changelog section drafted by | ______ |
|---|---|
| Release notes or announcement location | ______ |
| Who watches the issue tracker for 48 hours afterwards | ______ |
| Rollback plan if the release is broken | [ ] publish a fixed patch [ ] deprecate the version [ ] yank (PyPI) [ ] move dist-tag back |
Section E: after the release
Record what went wrong or took longer than expected: ______________________. Record one thing to automate before the next release: ______________________.
A filled-in line, for reference (illustrative)
For a hypothetical Package A moving from 2.3.1 to 2.4.0, section A's reason might read "adds an optional signal parameter to fetchAll; nothing removed", and section B would show the minimum runtime unchanged and no new deprecations. That is a minor release with no migration note required, and the rest of the sheet takes ten minutes. If instead section B shows a dropped runtime, stop and check the project's minimum supported runtime policy; many projects treat that as a major change.
Pair this worksheet with the npm pre-publish checklist or the PyPI release checklist on release day, and with the breaking change inventory when section B gets long.